Excavation - The finished level of patios is normally a minimum of 150mm below the damp proof course with all falls away from buildings.  The area to be paved is excavated by 175mm below the finished surface level.  scroll down the page to see both images

The excavation stage

deep excavation

previous page - back to main pagenext page