|
The Base - Where needed, recessed man holes are installed and steps built on concrete footings. A 100mm layer of limestone is spread and compacted to provide a solid sub-base. Where needed, a geo-textile membrane is laid first to stabilise the soil.
previous page - back to main page - next page
|